Hourly rate

The price of one hour of a specialist's work, which most web project quotes are built from. On its own it tells you nothing; it only means something once multiplied by the number of hours.

Also called
  • hourly rate
  • hourly billing
  • rate per hour
  • time and materials rate
  1. 01

    Where the differences come from

    A rate reflects experience, specialisation, the form of cooperation and the vendor's cost of running a business. The same scope quoted by a freelancer, a small team and a large agency will give three different rates, behind which sit three different levels of availability and accountability.

  2. 02

    Why a lower rate does not mean cheaper

    You pay the product, not the rate. A vendor who knows the technology can do in ten hours what another needs thirty for, and ends up cheaper despite the higher hourly price. The bill also includes rework, which can be a line item of its own when the scope was poorly understood.

  3. 03

    What an hourly quote should include

    A breakdown by role and stage, the estimated hours for each, the way time is reported and the rules for billing hours beyond the estimate. A quote given as a single number without this breakdown gives you no control over what you are paying for.

  4. 04

    What it is in Poland

    We have collected the ranges for individual roles and types of vendor in our pricing reports, for websites and for web applications. This is market data, not a price list, but it is enough to judge whether the quote you received is within the norm.

Related terms

  • Project estimateAn estimate of a project’s effort and cost made before it starts, based on what is known about the scope at that moment. It is not a price promise — the less is known, the wider its range should be.
  • Fixed price vs time and materialTwo ways of paying for a project: a fixed price for a scope agreed in advance, or payment for the time actually worked. The choice shifts risk between the client and the supplier.