Resources · glossary
Fixed price vs time and material
Two ways of paying for a project: a fixed price for a scope agreed in advance, or payment for the time actually worked. The choice shifts risk between the client and the supplier.
- fixed price
- time and material
- T&M
- fixed-price contract
- 01
Fixed price — what you buy
A set price for a set scope. The supplier takes on the risk that there will be more work — and builds it into the price, usually as a contingency buffer. Every change to the scope along the way needs a contract amendment, which can cause friction if the scope was described loosely.
- 02
Time and material — what you buy
The team’s working time, billed in cycles. The scope can change along the way, so the model copes where not everything is known at the start. It does, however, need trust and reliable reporting, without which the client loses control of the budget.
- 03
Which one when
Fixed price works when the scope is well described and unlikely to change — for example, a company website with a known structure. Time and material suits exploratory projects: an MVP, an app, an integration, where the first week of work usually changes the assumptions.
- 04
The mixed model
The most common compromise: a fixed price for the discovery and design stage, time and material for building and further development. The client gets a predictable start and a realistic quote for the rest of the work, instead of a buffer built into the price of the whole.
In practice
- ServiceSoftware developmentCustom software for companies of 30–300 people: internal systems, integrations and process automation — and when building beats buying.
- ArticleHow to choose a software development company — checks, contract and rights to the codeHow to choose a software development company in Poland: reading reviews and rankings, checking KRS filings, fixed price vs time and material, and code rights.
Related terms
- Project estimateAn estimate of a project’s effort and cost made before it starts, based on what is known about the scope at that moment. It is not a price promise — the less is known, the wider its range should be.
- Hourly rateThe price of one hour of a specialist's work, which most web project quotes are built from. On its own it tells you nothing; it only means something once multiplied by the number of hours.
15 minutes. No sales pitch.
A term in a proposal sounds foreign? In 15 minutes we explain what it means for your project.