Fixed price vs time and material

Two ways of paying for a project: a fixed price for a scope agreed in advance, or payment for the time actually worked. The choice shifts risk between the client and the supplier.

Also called
  • fixed price
  • time and material
  • T&M
  • fixed-price contract
  1. 01

    Fixed price — what you buy

    A set price for a set scope. The supplier takes on the risk that there will be more work — and builds it into the price, usually as a contingency buffer. Every change to the scope along the way needs a contract amendment, which can cause friction if the scope was described loosely.

  2. 02

    Time and material — what you buy

    The team’s working time, billed in cycles. The scope can change along the way, so the model copes where not everything is known at the start. It does, however, need trust and reliable reporting, without which the client loses control of the budget.

  3. 03

    Which one when

    Fixed price works when the scope is well described and unlikely to change — for example, a company website with a known structure. Time and material suits exploratory projects: an MVP, an app, an integration, where the first week of work usually changes the assumptions.

  4. 04

    The mixed model

    The most common compromise: a fixed price for the discovery and design stage, time and material for building and further development. The client gets a predictable start and a realistic quote for the rest of the work, instead of a buffer built into the price of the whole.

In practice

Related terms

  • Project estimateAn estimate of a project’s effort and cost made before it starts, based on what is known about the scope at that moment. It is not a price promise — the less is known, the wider its range should be.
  • Hourly rateThe price of one hour of a specialist's work, which most web project quotes are built from. On its own it tells you nothing; it only means something once multiplied by the number of hours.